Replica of the Titan crane of the south breakwater

/ The project

Cutting and drilling of profiles, assembly and welding of components,
and pre-assembly of the metal frame in the factory.
43,714 holes drilled
221.7 tonnes
Production according to EN 1090-2 EXC3, surface preparation
with P3 finish and ISO 5817:2014 class C welds.

/ Localization
Porto de leixões – Matosinhos

/ Year

2021